STAGE 1 - LOOP LC-ALLEN Oil Pipeline (VMOS) 130 km
Project: STAGE 1 - LOOP LC-ALLEN Oil Pipeline (VMOS) 130 km Client: YPF S. A. Location: Neuquén, ARGENTINA
STAGE 1 - LOOP LC-ALLEN Oil Pipeline (VMOS) 130 km Read Post »
Project: STAGE 1 - LOOP LC-ALLEN Oil Pipeline (VMOS) 130 km Client: YPF S. A. Location: Neuquén, ARGENTINA
STAGE 1 - LOOP LC-ALLEN Oil Pipeline (VMOS) 130 km Read Post »
Proyecto: Ruta Nacional N° 40 – Tramo: límite con Santa Cruz – empalme RP N° 22 (Río Mayo) Cliente: DIRECCION
National Route No. 40 – Border section with Santa Cruz – Junction RP No. 22 (Río Mayo) Read Post »
Project: National Route No. 23 – Los Menucos-Maquinchao Section Client: DIRECCION NACIONAL DE VIALIDAD Location: Río Negro Province, ARGENTINA
National Route No. 23 – Los Menucos-Maquinchao Section Read Post »
Project: Continuation of the Camino del Buen Ayre Highway. Section III (RP 58 – RP 53) and II (RP 58 access to Barrio 20 de Junio)
Project: National Road Corridor No. 2 Client: DIRECCION NACIONAL DE VIALIDAD Location: Buenos Aires and La Pampa provinces, ARGENTINA Description:
National Road Corridor No. 2 Read Post »
Project: Recovery and maintenance in 107 A Mesh Client: DIRECCIÓN NACIONAL DE VIALIDAD Location: Province of Chubut, ARGENTINA
Recovery and maintenance in 107 A Mesh Read Post »
Project: Recovery and maintenance in 632 mesh Client: DIRECCION NACIONAL DE VIALIDAD Location: Chubut Province, ARGENTINA Description: Mesh
Recovery and maintenance in 632 mesh Read Post »
Project: Recovery and maintenance in 107 B mesh Client: DIRECCION NACIONAL DE VIALIDAD Location: Chubut Province, ARGENTINA Description:
Recovery and maintenance in 107 B mesh Read Post »
Project: Construction of basic works and pavement of National Route No. 40, section: Perito Moreno – Bajo Caracoles, Section: km 49 – km 89
Project: Provincial Route No. 12 – Province of Chubut – Section: Junction of National Route No. 40 – Gualjaina Client: DIRECCION