Project: | STAGE 1 - LOOP LC-ALLEN Oil Pipeline (VMOS) 130 km |
Client: | YPF S. A. |
Location: | Neuquén, ARGENTINA |
Description:
The Project aims to increase the evacuation capacity of the Neuquén basin by 2.5 times in the next 3 years, maximizing the use of available infrastructure and developing new transport systems. This WORK consists of the adaptation of the installation, laying, construction and commissioning of section I of the VMOS Pipeline with access to the Allen pumping station operated by Oldelval.
Execution Period:: January 2024 - In Execution
