Project: | Oil dispatch terminal by offshore monobuoys in Caleta Córdova and Caleta Olivia |
Client: | QUITRALCO – YPF S.A. |
Location: | Chubut and Santa Cruz Provinces, ARGENTINA |
Description:
Assembly of the tank farm pumping system. Construction and laying of 24” pipes ballasted with reinforced concrete to feed oil to the monobuoys at 4.5 km from the coast, and 14” pipes to return ballast water from ships.
Execution Period:November 1980 - December 1981