Cerro Negro Mine – Retaining Wall

Project:Cerro Negro Mine – Retaining Wall
Client:GOLDCORP INC.
Location:Santa Cruz Province, ARGENTINA

Description:

Construction of 23 km of access road to the mine. Connection between Provincial Route No. 39 and the process plant. The construction work includes the clearing of the natural soil and the longitudinal stockpiling of the road, the profiling and compaction of the bearing surface, the excavation and the provision of soil for the embankment of approximately 300,000 m3, the graveling of the bearing layer and the restoration of the ditch profile. Drainage and flood defense construction works are included.

Execution Period:: June 2012 - May 2013