Project: | Extension of Veladero, Phase 6 |
Client: | MINERA ANDINA DEL SOL S.R.L. |
Location: | Mina Veladero, San Juan Province, ARGENTINA |
Description:
Construction and assembly for carrying out the leaching valley expansion works that include the following: – Construction of a pumping station in the new Phase 6 with its adduction pumps – Filtration recovery and recirculation system – Subdrain system – Excess collection system – Leak collection system – Installation of 30″ AC pipelines – Assembly of 2 drop boxes – Over Flow line system.
Execution Period:April 2019 - June 2020