Project: | Revamping of the TEF Plant |
Client: | TOTAL AUSTRAL S.A. |
Location: | Tierra del Fuego Province, ARGENTINA |
Description:
Engineering review, assembly and interconnection of a dehydration tower, an exchanger and a Cold Box with all its associated civil, structural, mechanical, electrical and instrumentation facilities.
Special Characteristics: The construction works were carried out while the plant was shut down with a tight work schedule.
Execution Period:: August 2005 - January 2006