| Project: | EPC – OLACAPATO COMPRESSOR STATION |
| Client: | Río Tinto Lithium / Minera del Altiplano S.A. |
| Location: | Los Andes Department, Salta Province, ARGENTINA |
Description:
As part of the expansion of lithium carbonate production at the Fénix Plant (Catamarca), Río Tinto Lithium will undertake the construction of a new Compressor Station, as part of the Natural Gas Transportation System, which includes the “Río de las Burras” Compressor Station, the “La Puna” Gas Pipeline, and the “Fénix” Gas Pipeline. Río Tinto Lithium desarrollará la construcción de una nueva Planta Compresora, como parte del Sistema de Transporte de Gas Natural conformado por la Planta Compresora “Río de las Burras”, el Gasoducto “La Puna” y el Gasoducto “Fénix”.
The project involves the construction and commissioning of a Natural Gas Compressor Station, including engineering, procurement, construction, assembly, and commissioning.
Execution Period:: In progress.
