Project: | Plant for the secondary recovery at km 9 – Comodoro Rivadavia |
Client: | YPF S.A. |
Location: | Chubut Province, ARGENTINA |
Description:
Detailed engineering, provision and assembly of a treatment plant, filtering, and high-pressure pumping of formation water, including construction of 2 Russian tanks of 2,000 m3 and 116 m3, assembly of 10 high-pressure electric pumps, drinking water and irrigation networks, installation of fire protection network.
Execution Period:: February 1995 - July 1996

