Project: | Expansion of natural gas transportation and distribution system |
Client: | MINISTERIO DE ENERGIA Y MINERÍA |
Location: | Provincias Neuquén, Río Negro y Chubut, ARGENTINA |
Description:
The project includes the execution of the construction work, provision of materials, equipment, tools, manpower, the procedures and obtaining of authorizations and permits corresponding to the expansions in the mountain/Patagonian system, loops of the mountain and Patagonian gas pipelines in Gobernador Costa, Leleque, Trevelin and Lago Puelo (Chubut), and San Martín de los Andes, Junín de los Andes and Villa La Angostura (Neuquén).
Execution Period:: November 2017 - October 2018