Perito Francisco Pascasio Moreno Gas Pipeline (formerly known as GPNK Mercedes–Cardales Section)

Project:

Perito Francisco Pascasio Moreno Gas Pipeline (formerly known as GPNK Mercedes–Cardales Section)

Client:

ENARSA

Location:

Province of Buenos Aires, ARGENTINA. 

Description:

Engineering, Procurement, Construction and Assembly of 80,440 meters of 30” pipeline + 3 30” block valves + 2 30” scraper traps + 3 metering stations. Detail Engineering: 21,300 estimated man-hours.

Main figures:

  • 2.4 million inch-meters + 55 crossings.
  • 13,800 inches of welding (facilities).
  • Installation of 20 units (7 filters, 2 traps, 4 surge tanks, 4 sump tanks, 3 skids).
  • 1,100 m³ of concrete.
  • 450 instruments (including valves and I&C equipment). 


Execution Period:: October 2022 - December 2024