Project: | GASDUC III Gas Pipeline |
Client: | TRANSPORTADORA ASOCIADA DE GAS S.A. – PETROBRAS |
Location: | Rio de Janeiro, BRAZIL |
Description:
Construction of 77 km of 38” gas pipeline, including 3 river crossings through directional horizontal drilling, assembly within a 4 km long tunnel, installation of pipeline in swamp and steep slope area. Surface installations.
Special Characteristics: Participation of 4,000 workers, magnitude of resources and short
Execution Period:: August 2008 - August 2010