Project: | Construction of collection pipeline and facilities – Sábalo 7 |
Client: | Petrobras Bolivia S.A. |
Location: | Tarija, BOLIVIA |
Description:
Construction, assembly, commissioning and assistance for the implementation of a 12.5 km x 10″ hydrocarbon collection pipeline, its fiber optic network and surface facilities in turnkey mode. The linking of the SBL-7 well with the Sábalo gas plant (San Antonio) includes, among other activities, the analysis and validation of the basic engineering and the provision of materials (except for the main pipeline).
Special Characteristics: Numerous ravines in rugged topography.
Execution Period:: March 2011 - June 2012