loader image

Construction of the Central – West Aqueduct

Project:Construction of the Central – West Aqueduct
Client:ENTE NACIONAL DE OBRAS HÍDRICAS DE SANEAMIENTO (ENOHSA)
Location:Santa Fe Province, ARGENTINA

Description:

EPC contract for the construction of 236 km of aqueduct with diameters between 500 mm and 160 mm, with GFRP and PVC pipes, including the intake work for 243 l/sec within the Coronda River through a 250-meter dock, treatment plant, 4 pumping plants and 17 cisterns in different locations, controlled by a SCADA system.

Special Characteristics:  Drinking water for 14 cities.

Execution Period:: March 2006 - April 2009

en_US
Scroll to Top