Project: | Construction of the Central – West Aqueduct |
Client: | ENTE NACIONAL DE OBRAS HÍDRICAS DE SANEAMIENTO (ENOHSA) |
Location: | Santa Fe Province, ARGENTINA |
Description:
EPC contract for the construction of 236 km of aqueduct with diameters between 500 mm and 160 mm, with GFRP and PVC pipes, including the intake work for 243 l/sec within the Coronda River through a 250-meter dock, treatment plant, 4 pumping plants and 17 cisterns in different locations, controlled by a SCADA system.
Special Characteristics: Drinking water for 14 cities.
Execution Period:: March 2006 - April 2009

