loader image

GASDUC III Gas Pipeline

Project:GASDUC III Gas Pipeline
Client:TRANSPORTADORA ASOCIADA DE GAS S.A. – PETROBRAS
Location:Rio de Janeiro, BRAZIL

Description:

Construction of 77 km of 38” gas pipeline, including 3 river crossings through directional horizontal drilling, assembly within a 4 km long tunnel, installation of pipeline in swamp and steep slope area. Surface installations.

Special Characteristics: Participation of 4,000 workers, magnitude of resources and short

Execution Period:: August 2008 - August 2010

en_US
Scroll to Top