| Project: |
Perito Francisco Pascasio Moreno Gas Pipeline (formerly known as GPNK Mercedes–Cardales Section) |
| Client: |
ENARSA |
| Location: |
Province of Buenos Aires, ARGENTINA. |
Description:
Engineering, Procurement, Construction and Assembly of 80,440 meters of 30” pipeline + 3 30” block valves + 2 30” scraper traps + 3 metering stations. Detail Engineering: 21,300 estimated man-hours.
Main figures:
- 2.4 million inch-meters + 55 crossings.
- 13,800 inches of welding (facilities).
- Installation of 20 units (7 filters, 2 traps, 4 surge tanks, 4 sump tanks, 3 skids).
- 1,100 m³ of concrete.
- 450 instruments (including valves and I&C equipment).
Execution Period:: October 2022 - December 2024