| Project: |
Pipeline and Flowline Installation 2025/2027 – East Cluster Pipelines 2 and 3 |
| Client: |
YPF S.A. |
| Location: |
La Amarga Chica – Aguada del Chañar, ARGENTINA. |
Description:
The main works include the installation and replacement of pipelines (steel, GRP, HDPE, and flexible pipes), as well as the installation of field manifolds, well manifolds, and injection units.
The scope also includes the installation of production manifolds with their respective HIPPS safety systems and associated assemblies, along with the installation of injection manifolds and scraper traps at their corresponding locations.
The project also involves the construction of flowlines within well pad locations and their corresponding connections.
It includes earthworks, foundations, chambers, pipe racks, steel structures, piping, electrical supply and connections, fencing, signage, lighting poles, and flood mitigation works, among other tasks.
Execution Period:: In progress.